Cortec Boiler Gecko™
- Regular price
- RM 0.00
- Sale price
- RM 0.00
- Regular price
-
RM 0.00
Share
Product Description
Cortec’s Boiler Gecko™ is a convenient ready-to-use Vapor phase Corrosion Inhibitor (VpCI®) packaged in an airpowered spray can for use in the dry layup of small boilers and steam components. Boiler Gecko™ is effective for seasonal or long-term preservation of waterside and fireside components in boiler systems where the use of a Boiler Lizard® or traditional layup methods are not practical or effective. The VpCI® molecules will ensure protection throughout the boiler and direct application to a metal surface is not required. There is no need for product removal or additional flushing before the boiler is filled and returned to service
Packaging & Storage
Boiler Gecko™ is available in 12 oz (340 g) EcoAir® bag-onvalve spray cans powered by compressed air.
To ensure best product performance, store in original packaging, indoors, and out of direct sunlight at 40-100 °F (4- 38 °C).
Shelf life: 2 years
Features
- No heavy metals, halogens, or solvents
- Free of detrimental elements prohibited in nuclear industry
- Nitrite-free
- Silicon-free
- Readily water soluble
- Does not form solid residue
- pH neutral
- Low odor
- Non-flammable
- Air-powered (no chemical propellants)
- Able to spray in any direction, even upside down
Benefits
- Multi-metal protection
- Vapor-phase corrosion protection for surfaces where Boiler Gecko™ has not been directly applied
- Easy to apply
- No need to remove
Metals Protected
- Carbon Steel
- Stainless Steel
- Galvanized Steel
- Cast Iron
- Aluminum and Alloys
- Copper and Alloys
Typical Properties
| Appearance | Clear Liquid |
| Density | 8.4-8.6 lbs/gal (1.00-1.03 kg/L) |
| pH | 7.1-7.5 (Neat) |
| Freeze Point | 14 °F (-10 °C) |
| Odor | Slight |
Application
Completely drain and cool boiler. Shake Boiler Gecko™ well before use. Spray evenly and consistently throughout the internal void space to ensure proper distribution of the product. No product removal is required prior to boiler startup. When the boiler is put back in service, fill with water and employ normal startup procedure. The remaining product will dissolve. One Boiler Gecko™ will treat approximately 100 gallons (380 L) of boiler volume.